{"id":295,"date":"2022-06-02T10:36:22","date_gmt":"2022-06-02T10:36:22","guid":{"rendered":"https:\/\/peer.com.au\/peerconstruction\/?page_id=295"},"modified":"2024-03-13T01:54:52","modified_gmt":"2024-03-13T01:54:52","slug":"drawing-policy","status":"publish","type":"page","link":"https:\/\/peer.com.au\/peerconstruction\/drawing-policy\/","title":{"rendered":"Drawing policy"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;intro background&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; background_color=&#8221;#1E1E1E&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;1_2,1_2&#8243; admin_label=&#8221;Title banner&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text admin_label=&#8221;Title&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; text_font=&#8221;Raleway||||||||&#8221; text_text_color=&#8221;#1E1E1E&#8221; header_font=&#8221;Raleway|600|||||||&#8221; header_text_color=&#8221;#FAA61A&#8221; header_font_size=&#8221;45px&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h1>Drawing policy<\/h1>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; text_font=&#8221;Raleway||||||||&#8221; text_text_color=&#8221;#FFFFFF&#8221; text_font_size=&#8221;20px&#8221; custom_padding=&#8221;||0px|||&#8221; global_colors_info=&#8221;{}&#8221;]This policy establishes a uniform appearance and a consistent structure for all hand drawn and electronic information produced.  The technical standards in this policy detail the requirements for production and submission of drawings, created or modified for PEER Construction.[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;3_4,1_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;3_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text admin_label=&#8221;Purpose and scope&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;||0px|||&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h2>Purpose<\/h2>\n<p>The purpose of this policy is to:<\/p>\n<ul>\n<li>set a standard for PEER Construction in terms of technical drawing standards<\/li>\n<li>align with the standards set by PEER Construction policies and procedures and legislative requirements, especially the Work Health and Safety Act 2012 (SA) and the Environment Protection Act 1993<\/li>\n<li>ensure drawings comply with the current Australian Standard including but not limited to: Australian Standard 1100.101 Technical drawing Part 101: General principles, Australian Standard 1100.301 Technical drawing Part 301: Architectural drawing.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h2>Scope<\/h2>\n<p>This policy applies to all employees developing drawings including hand drawn drawings and sketches.<\/p>\n<p>&nbsp;<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_search _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_search][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; background_color=&#8221;#F5F5F5&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text admin_label=&#8221;H2 text to accordion grey backgorund&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h2>Drawing requirements<\/h2>\n<p>Drawings should meet the following requirements.[\/et_pb_text][et_pb_accordion admin_label=&#8221;Accordion grey background&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_accordion_item title=&#8221;Drawing numbers&#8221; open=&#8221;on&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>Every new drawing shall have a PEER Construction drawing number. Each drawing number can contain up to 99 sheets, however each sheet must exist as an individual file. Multiple sheets can be used in instances where the drawing set covers a single discipline over the same asset.<\/p>\n<p>Do not use 0ld pages, new drawings must only contain one sheet per file.<\/p>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Drawing scale&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]Drawings should be scaled as per Australian Standard AS 1100 alternatively an industry accepted scale may be used. <\/p>\n<p>You should use only one scale clearly indicated at the bottom of the drawing. Individual views with different scales should indicate the scale clearly below the view heading.[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Drawing sheet information &#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]<\/p>\n<p>All drawings and sketches shall be completed on a PEER Construction <a href=\"https:\/\/peer.com.au\/peerconstruction\/forms\/\" target=\"_blank\" rel=\"noopener\">graph sheet<\/a>.<\/p>\n<p>The Title Block should show all required information throughout the life of the drawing including:<\/p>\n<ul>\n<li>date drawn<\/li>\n<li>site address<\/li>\n<li>number of sheet (page) in relation to others<\/li>\n<li>name of sheet<\/li>\n<li>name of client<\/li>\n<li>scale used<\/li>\n<li>date of amendments<\/li>\n<li>draftsperson&#8217;s name.<\/li>\n<\/ul>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Drawing standards&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]<\/p>\n<p>Drawings must comply with the current Australian Standards:<\/p>\n<ul>\n<li>Australian Standard 1100.101 Technical drawing Part 101: General principles<\/li>\n<li>Australian Standard 1100.301 Technical drawing Part 301: Architectural drawing.<\/li>\n<li>Australian Standards 3500: 1-4 Plumbing and Drainage<\/li>\n<li>Australian Standards 5601: 1-2 Gas Installations<\/li>\n<\/ul>\n<p>When developing drawings, you should follow the drawing conventions and use abbreviations and symbols applicable under the Australian Standards.<\/p>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Tools and equipment&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]<\/p>\n<p>You should ensure you have the correct tools for developing drawings such as:<\/p>\n<ul>\n<li>writing and sketching equipment \u2013 including HB pencils, erasers and pens<\/li>\n<li>automatic level and staff<\/li>\n<li>ruler<\/li>\n<li>compass<\/li>\n<li>drawing board<\/li>\n<li>protractors<\/li>\n<li>scale ruler<\/li>\n<li>sharpener<\/li>\n<li>drafting paper\/sheet.<\/li>\n<\/ul>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Storage&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]<\/p>\n<p>All original drawings must be kept at PEER Construction in the project file and marked with the appropriate version number.<\/p>\n<p>Site file: PDFs of the original drawings must be kept in a site file.<\/p>\n<p>All original drawings completed by apprentices must be handed to supervisor for review and storage.<\/p>\n<p>[\/et_pb_accordion_item][\/et_pb_accordion][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;H2 intro to accordion &#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h2>Freehand sketching techniques<\/h2>\n<p>The following is a guide to freehand sketching techniques.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_accordion admin_label=&#8221;Accordion white background&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_accordion_item title=&#8221;Horizontal lines &#8221; open=&#8221;on&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>When you are drawing horizontal lines, your hand slides from left to right. Measure the distance between the two established points with your eyes. Short joining lines may provide an acceptable finish especially when drawing longer lines.<\/p>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Vertical lines &#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]Use a wrist movement from top to bottom when you draw a vertical line. [\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Sloping lines &#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]When you are drawing a line from upper left to lower right, make the movement with your wrist, holding your hands above the line. Draw lines from lower left to upper right by sliding your whole hand. When drawing lines from upper right to lower left, use your wrist. Your hand should always be below the line.[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;Hand position&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; open=&#8221;off&#8221;]Position your hand at the end of the pencil to gain more control and precision and darker markings. Positioning your hand further up the pencil gives you less control, producing lighter markings.<\/p>\n<p>To keep lines straight, move your entire arm. No shape is more important in drawing architecture than a simple straight line. <\/p>\n<p>If you want to draw straight lines without a ruler, you must lock your wrist and elbow. [\/et_pb_accordion_item][\/et_pb_accordion][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_tabs admin_label=&#8221;References and related&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_tab title=&#8221;References&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>Australian Standard 1100.101 Technical drawing Part 101: General principles<br \/>Australian Standard 1100.301 Technical drawing Part 301: Architectural drawing.<br \/>Australian Standards 3500: 1-4 Plumbing and Drainage<br \/>Australian Standards 5601: 1-2 Gas Installations<\/p>\n<p>[\/et_pb_tab][et_pb_tab title=&#8221;Related&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>Approved graph paper<\/p>\n<p>[\/et_pb_tab][et_pb_tab title=&#8221;Version &#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>Version 1.0 &#8211; Last updated 6\/2\/2022<\/p>\n<p>[\/et_pb_tab][\/et_pb_tabs][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; fullwidth=&#8221;on&#8221; _builder_version=&#8221;4.17.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drawing policyThis policy establishes a uniform appearance and a consistent structure for all hand drawn and electronic information produced. The technical standards in this policy detail the requirements for production and submission of drawings, created or modified for PEER Construction.Purpose The purpose of this policy is to: set a standard for PEER Construction in terms [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-295","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/pages\/295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/comments?post=295"}],"version-history":[{"count":5,"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/pages\/295\/revisions"}],"predecessor-version":[{"id":1666,"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/pages\/295\/revisions\/1666"}],"wp:attachment":[{"href":"https:\/\/peer.com.au\/peerconstruction\/wp-json\/wp\/v2\/media?parent=295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}